[SlideDeck2 id=1166]
This sealcoating project took place in Rockford, IL. This project consisted of
sealcoating, cracksealing, and re-striping the existing parking stalls. The process
starts with cleaning the parking. After all the debris is off the lot, the cracksealing
takes place. Once the cracksealing is complete then the sealcoating process begins.
After the sealcoating has cured, then the striping of the existing parking stalls are
painted.